A complete bathroom scope
Built around the details that matter
RAA manages bathroom remodeling from demolition and layout planning through plumbing, electrical, waterproofing, tile, and final fixtures. Options can include curbless or walk-in showers, custom vanities, natural stone, glass installation, radiant floor heat, smart lighting, and improved ventilation. Each project is permitted where required, with a scope and fixed-price proposal prepared before construction begins.
What’s included
Design-build bathroom remodeling
One team coordinates the work behind the walls and the finishes you see every day.
Layout and 3D planning
Rework the room around your goals with layout redesign, selections, and 3D renderings before construction.
Waterproofing and tile
Shower systems use a bonded waterproof membrane such as Schluter Kerdi or an equivalent system, with slope-to-drain verification before tile installation.
Comfort and function
Choose from radiant floor heating, custom vanities, stone fabrication, smart lighting, ventilation, and controls.
A sound foundation
Waterproofing comes before the finish
Bathrooms expose poor construction quickly. RAA’s bathroom remodels include a full waterproofing specification, membrane installation, sealed penetrations, and slope-to-drain verification before tile covers the work. Plumbing relocations, electrical changes, ventilation, and framing are coordinated under permit when required, with inspections scheduled at the appropriate stages. The result is a bathroom planned as a complete system—not just a collection of surface finishes.
Bathroom Remodeling FAQs
Common questions about bathroom remodeling
How long does a bathroom remodel take?
A guest bath typically runs 4 to 6 weeks. A primary suite with structural or layout changes usually takes 8 to 12 weeks once permits are pulled.
Can you move plumbing to reconfigure the layout?
Yes. RAA handles wall, floor, and slab plumbing relocations under permit. A slab cut can add cost and schedule considerations, so the existing conditions should be reviewed before the layout is finalized.
Do you waterproof showers correctly?
Every shower uses a bonded waterproof membrane system, such as Schluter Kerdi or an equivalent, with slope-to-drain verification and sealed penetrations before tile goes down.
RAA Construction Group