Skip to content
RAA Construction Group 866-880-0133Free Quote
Remodeled bathroom with refined tile, fixtures, and finishes

Bathroom Remodeling

Everyday rituals, elevated.

Create a bathroom with thoughtful layouts, spa-grade finishes, precision tile work, and waterproofing designed for lasting performance across Woodland Hills and Los Angeles.

Bathroom Remodeling EstimateRequest a Free Quote
By submitting, you authorize RAA Construction Group to reach out to you via call, email, or text for information about appointment setting, marketing, and any other project needs. We will never share your personal information with third parties for marketing purposes. message frequency may vary based on project needs. You can opt out at any time. Message/data rates apply. Consent is not a condition of purchase. Terms and conditions | Privacy Policy

A complete bathroom scope

Built around the details that matter

RAA manages bathroom remodeling from demolition and layout planning through plumbing, electrical, waterproofing, tile, and final fixtures. Options can include curbless or walk-in showers, custom vanities, natural stone, glass installation, radiant floor heat, smart lighting, and improved ventilation. Each project is permitted where required, with a scope and fixed-price proposal prepared before construction begins.

What’s included

Design-build bathroom remodeling

One team coordinates the work behind the walls and the finishes you see every day.

Layout and 3D planning

Rework the room around your goals with layout redesign, selections, and 3D renderings before construction.

Waterproofing and tile

Shower systems use a bonded waterproof membrane such as Schluter Kerdi or an equivalent system, with slope-to-drain verification before tile installation.

Comfort and function

Choose from radiant floor heating, custom vanities, stone fabrication, smart lighting, ventilation, and controls.

Bathroom remodeling project with tile and contemporary fixtures

A sound foundation

Waterproofing comes before the finish

Bathrooms expose poor construction quickly. RAA’s bathroom remodels include a full waterproofing specification, membrane installation, sealed penetrations, and slope-to-drain verification before tile covers the work. Plumbing relocations, electrical changes, ventilation, and framing are coordinated under permit when required, with inspections scheduled at the appropriate stages. The result is a bathroom planned as a complete system—not just a collection of surface finishes.

Bathroom Remodeling FAQs

Common questions about bathroom remodeling

How long does a bathroom remodel take?

A guest bath typically runs 4 to 6 weeks. A primary suite with structural or layout changes usually takes 8 to 12 weeks once permits are pulled.

Can you move plumbing to reconfigure the layout?

Yes. RAA handles wall, floor, and slab plumbing relocations under permit. A slab cut can add cost and schedule considerations, so the existing conditions should be reviewed before the layout is finalized.

Do you waterproof showers correctly?

Every shower uses a bonded waterproof membrane system, such as Schluter Kerdi or an equivalent, with slope-to-drain verification and sealed penetrations before tile goes down.

RAA Construction Group

Ready for your free quote?

Get Free Quote